United States Army Corps of Engineers – Buzzards Bay Bridge

Project Write Up: TESI designed, build and installed two TC1K Rack and Pinion Elevator in Buzzards Bay, MA. North Elevator 181 feet with 3 landings and South Elevator 181 feet with 2 landings.

Project Name: USACE Cape Cod Railroad Bridge Elevator Replacement